An initial investment of RM90 million was made into our wastewater system, with an additional RM48 million recently invested to further its enhancement.
Maintained the highest Standard A for effluent discharge, going beyond the Standard B benchmark set by the DOE.
1st in the industry to have installed biomass energy plant which uses empty oil palm fruit bunches as biomass fuel to generate heat for production processes.
Our biomass energy plant was also the 1st in Malaysia to be registered with the United Nations Framework Convention on Climate Change (UNFCCC) or Kyoto Protocol.
Invested a total of RM127 million to transition to greener energy and reduce our dependence on fossil fuel-based sources.
Housed 2 cogeneration power plants at our facilities.
Reduction target of 25% carbon emissions intensity by FY2026 (using FY2023 as baseline).
ISO 14001:2015 certified for our environmental management system.
A key component of our renewable energy initiative is the 1.65 MW solar photovoltaic system at our NGC facility. With an installed capacity of 2,357 kWp, this rooftop solar system generated 2,980 MWh of clean electricity in FY2024, a 15% increase from the previous year.
65% of waste generated was diverted from landfills for recycling.
Upheld track record of zero incidents of environmental non-compliance.
Conducted Critically reviewed Life Cycle Assessment (LCA) for key products.